Master of Business Administration - MBA Semester 2
MB0044–Production and Operation Management-4 Credits
(Book ID: B1627)
Assignment (60 Marks)
Note: Answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme. Each Question carries 10 marks 6 X 10=60.
Q1. State the important considerations for locating an automobile plant.
Answer. General factors:
The general factors that influence the plant location are listed as follows:
Availability of land – Availability of land plays an important role in determining the plant location. On several occasions, our plans, calculations and forecasts suggest a particular area as the best to start an organization. However, availability of land may be in question. In such cases, we will have to choose the second best location.

Q2. Explain essentials of Project Management Philosophy.
Answer. Essentials of Project Management Philosophy:
Characteristics of project mindset
Project management is all about the mindset. Figure depicts all the major characteristics of a project mindset.
a) Time: It is an important parameter in framing the right mindset. It is possible to improve the pace of the project by reducing the time frame of the process. The mindset is normally to work out a comfort mode by stretching the time limits.

Q3. Several different strategies have been employed to assist in aggregate planning. Explain these in brief.
Answer. Three focused or pure strategies are:
Vary production to match demand by changes in employment (Chase demand strategy): This strategy permits hiring and layoff of workers as required. When the output is to be increased more workers are added and when the output is to be decreased, workers are removed.
Produce at a constant rate and use inventories (Level production strategy): This strategy retains a stable work force producing

Q4. Illustrate the different methods by which quality is sought to be achieved using various tools and techniques.
Answer. Quality Control Techniques:
Quality control techniques are specific activities and procedures adopted using data, for determining a particular aspect of quality to arrive at decisions which are conclusive. Each technique developed and tested by senior personnel or consultants will be simple enough to be understood, implemented, and interpreted by the personnel for their immediate use. The techniques to be used, the criteria to be adopted and the

Q5. Explain the basic competitive priorities considered while formulating operations strategy by a firm?
Answer. Operations Management and Strategy:
Operations management is one of the major functions of any business organization. Marketing discovers the destination for the product or service that is produced. Operations provide the deliverables by utilizing the resources and producing the same. All equipments, facilities, technology, information, human
Q6. Explain briefly the four classification of scheduling strategies?
Answer.  Scheduling Strategies
Scheduling strategy differs from organization to organization as it depends on the quantum of production, size and type of production, company’s policy, and priorities, etc. Most of these strategies are concerned with job shop production since the problems encountered is more when more than one product is produced in the same plant.
Following are the classifications:-
Ø  Detailed scheduling
Ø  Cumulative scheduling
Ø  Cumulative-detailed scheduling
Ø  Priority decision